Drive through almost any neighborhood in Aurora and you'll pass hundreds of houses sitting on a bare concrete basement. Sooner or later a lot of those become a family room, a guest bedroom, an office, or all three.
Framing is forgiving. You can move a wall. Paint is forgiving. The wiring isn't, at least not once there's drywall over it. An outlet in the wrong spot or a ceiling with no box where the TV ended up costs a few dollars to fix with the studs open and a few hundred after. So this is the list we walk through with people while the basement is still framing and concrete.
Start with the permit
The city of Aurora requires a permit for every basement finish, with plans submitted, and the job gets framing, mechanical, plumbing and electrical inspections. The electrical has two of its own: a rough inspection with the walls still open, and a final once everything is trimmed out.
That order matters. Insulation and drywall can't go up until the rough electrical passes, so the electrician's schedule and the inspector's schedule end up setting the pace for the drywall crew. Build that into your timeline. We wrote up how permits work in Aurora, including what you can pull yourself, in our guide to electrical permits.
Outlets: more than you think, and all of them protected
Spacing. In living spaces, no point along a wall can be more than 6 feet from an outlet. Any wall 2 feet wide or more counts, including the short piece of wall beside a door. A big open rec room ends up with more outlets than people expect, which is a good thing on movie night.
GFCI. Under the current code, every receptacle in a basement needs ground-fault protection, finished or not. That used to apply only to unfinished areas. It doesn't anymore.
AFCI. Bedrooms, family rooms, rec rooms, offices and hallways also need arc-fault protection. The tidy way to cover both is a dual-function AFCI/GFCI breaker for each circuit, rather than a GFCI outlet in every room.
Plan for the furniture you'll actually have. Mark where the couch goes, where the desk goes, and where the TV will hang. Then put an outlet and a low-voltage box behind the TV with a conduit between them, so the cords and an HDMI cable disappear into the wall instead of dangling down it.
Bathrooms, wet bars and anything with a motor
- A basement bathroom needs its own 20-amp circuit for the receptacles, plus the exhaust fan and lights.
- A wet bar with a mini fridge, a microwave or an ice maker deserves a 20-amp circuit of its own, with GFCI at the counter.
- Equipment-heavy rooms, like a home gym with a treadmill or an office with a server closet, are worth a dedicated circuit so nothing trips halfway through a run or a backup.
Bedrooms bring alarm requirements
Adding a bedroom triggers two things beyond the egress window your framer will already be talking about.
Smoke alarms. One inside each new bedroom, one outside it, and one on the basement level. With the walls open, the new alarms get wired in with battery backup, and the code expects them interconnected with the alarms upstairs, so one going off sets off the rest.
Carbon monoxide alarms. In a house with gas appliances or an attached garage, Colorado's standard is a CO alarm within 15 feet of the door to every room used for sleeping, and a permitted remodel is exactly when an inspector checks for them. A basement bedroom near the furnace room makes this one easy to forget and important not to.
Lighting for low ceilings
Basement ceilings are rarely generous. Ductwork, beams and soffits eat into them, and a standard recessed can needs depth that a basement often doesn't have. Canless wafer LEDs sit nearly flush, fit where the joists are shallow, and are what we use most in basements now. If you're deciding on spacing or layout, our lighting installation page covers it.
Two things to get right while the ceiling is open:
- Switch every entrance. The stairway needs a switch at the top and the bottom. Rooms with two doors should get a switch at each one.
- Put boxes where fixtures might go later. A ceiling box over the future pool table or the bar costs almost nothing now.
The two things people forget
The radon fan. A lot of Aurora homes have a radon mitigation system, or will once someone tests. The fan needs power, and the city wants a permit when new wiring is run for one. If you're planning to test or mitigate, get the circuit in before the ceiling closes.
The panel. Don't box it into a closet full of shelves. The code requires a clear working space in front of it, 30 inches wide and 3 feet deep, with headroom above, and inspectors check. A door in front of a panel is fine. Shelving in front of it isn't.
Will your panel handle it?
A typical basement finish adds somewhere between four and eight new circuits. That raises two questions: are there enough empty breaker spaces, and is there enough capacity left on the service?
Space is the more common problem. Dual-function breakers are full size, and many panels can't take the slim tandem breakers that used to squeeze extra circuits in. A sub-panel in the basement often solves it neatly, and puts the breakers for the new rooms right where you'll be living. If the service itself is at its limit, a panel upgrade belongs in the budget too. We'll tell you which one you're looking at after a quick look and a load calculation.
Who does what
Homeowners in Aurora can pull a permit for work on their own primary home. If you hire someone, the city requires them to be licensed with Aurora, and electrical work for pay in Colorado has to be done by a licensed electrician.
On most basement jobs we work alongside a general contractor or a homeowner who's handling the framing and drywall. The best time to bring us in is right after framing: walk the space with us, mark the boxes on the studs, and we rough it in, meet the city's inspector, and come back to trim out once the paint is dry. If you're at that stage, tell us about the project and send a floor plan if you have one. A sketch on graph paper works fine.
For everything else around the house, from adding outlets to tracking down a dead circuit, see our residential electrical services.