Your Panel Was Sized for a Different House
Plenty of homes around Aurora still run on the 100-amp panel they were built with. That was enough when the big loads were a range and a dryer. Add central air, an EV, a hot tub or a finished basement and the math stops working. You notice it as breakers that trip when two things run at once, lights that dim when the AC kicks on, or a panel with no open slots left.
Some panels need to go no matter how much capacity they have. Federal Pacific Stab-Lok and Zinsco panels, both common in houses built in the 1960s and 70s, use breakers with a long record of not tripping when they should. Home inspectors flag them and some insurers balk at them. We look at what you have, run a load calculation and tell you plainly if you need a 200-amp service upgrade, a straight panel swap or just a sub-panel. You get it in writing before anything gets touched.
Every panel job includes
- Load calculation for your home
- Permit pulled with your city
- Utility shutoff and reconnect arranged
- Every circuit labeled at the new panel
- Grounding and bonding brought to code
- Inspection scheduled and passed

What Sets the Price on a Panel Upgrade
No two panel jobs cost the same, which is why we quote after we've seen yours. These four things move the number most, and each one is spelled out in your written estimate before work starts.
Swap or Service Upgrade
Replacing a panel at the same amperage is the smaller job. Going from 100 to 200 amps usually means a new meter base and service cable too, plus a disconnect and reconnect by the utility.
Where the Panel Lives
A panel on an open garage wall is easy to reach. One tucked into a finished basement or a closet can mean drywall work, or moving it somewhere that meets today's clearance rules.
What's Behind the Cover
Undersized grounding, brittle wire ends and doubled-up breakers all get fixed while the panel is open. We'd rather tell you up front than close it back up.
Surge Protection and Add-Ons
Whole-home surge protection, AFCI and GFCI breakers where your inspector requires them, and open spaces left for the charger or hot tub you're planning.
Did an inspector flag your panel? Tell us the brand and amperage printed on the label inside the panel door when you ask for a quote. That alone tells us most of what we need to know about how big the job is.
Panels Made Safe and Up to Code
Before You Upgrade Your Panel
What homeowners ask us while we're standing in front of the panel, reading the label.
Ask Us About Your JobThe usual signs are breakers that trip when two big loads run together, lights that dim when the AC or dryer starts, no empty slots in the panel, and anything warm, buzzing or scorched at the panel itself. Your plans matter too. If you're adding an EV charger, a heat pump or a hot tub, a load calculation tells you whether the panel can carry it.
For a house with gas heat, a gas range and no EV, 100 amps often still works fine. Electric heat or a heat pump, an EV, a hot tub or a big addition usually push you to 200. The load calculation settles it with numbers instead of guesses. If 100 really is enough for you, we'll say so.
Both brands have breakers that, in testing and in real homes, fail to trip too often, and tripping is the one job a breaker has. Not every one will fail, but there's no way to tell which ones will. Swapping individual breakers doesn't fix the problem, so we recommend replacing the whole panel.
Most panel swaps are a one-day job, and the power is off for most of that day. A 200-amp service upgrade can take a bit longer because the utility has to disconnect and reconnect the service. We set that up and tell you ahead of time when the power goes off, so you can plan around it.
Yes. It often makes sense when you're finishing a basement or remodeling. A panel needs clear working space in front of it, and code keeps it out of bathrooms and clothes closets. Moving it costs more than a swap in place, because every circuit has to be extended to reach the new spot, so it's usually worth doing at the same time as the upgrade.
It takes a common inspection flag off the table. Buyers' inspectors call out Federal Pacific and Zinsco panels, doubled-up breakers and missing grounding all the time, and those findings tend to turn into repair requests. If you're listing soon, a pre-sale electrical inspection shows you what's worth fixing first.
Get a Price on Your Panel Upgrade
Tell us the brand and amperage on the panel label, roughly when the house was built and what you're planning to add. We'll come back with next steps, usually the same business day.
Form not loading? Open the request form in a new tab or call (720) 237-2639.
- Monday to Friday 8 AM to 7 PM
- Saturday 9 AM to 3 PM
- Sunday Closed
- We read your request and call or email you back.
- Small jobs get a price on the phone. Bigger ones get a visit and a written estimate.
- You pick a day. Most jobs are on the calendar within 2 to 5 business days.
Licensed and insured in Colorado

